Featured Image

Production Schedule Volatility Got You Down?

  • On 07/22/2018
Manufacturers need to step back and think about what they want to achieve with a production schedule so they can take maximum advantage of their ERP system and make it more effective   Many manufacturers are all too familiar with the concept of "MRP volatility" or "system nervousness" regarding their ERP production schedule.  The root cause […]
Read More
 
Featured Image

Setting Effective Inventory Safety Stock Levels

  • On 02/15/2018
  • inventory, safety stock
The role of safety stock (a.k.a., "minimum inventory levels") and its relationship with demand is commonly misunderstood. A popular intuition is to increase safety stocks whenever an increase in demand is anticipated. However, this misses the point of what safety stock levels should be designed to do.  The use of average expected rates of demand […]
Read More
 

© 2022 Altemir Consulting, LLC